We have located links that may give you full text access.
Naturally occurring radioactive materials in offshore infrastructure: Understanding formation and characteristics of baryte scale during decommissioning planning.
Journal of Hazardous Materials 2024 January 16
Contaminants, including naturally occurring radioactive material (NORM) of the 238-uranium and 232-thorium decay series, have been recognized as a global research priority to inform offshore petroleum infrastructure decommissioning decisions. This study aimed to characterize pipeline scale retrieved from a decommissioned subsea well tubular pipe through high-resolution elemental mapping and isotopic analysis. This was achieved by utilizing transmission electron microscopy, Synchrotron x-ray fluorescence, photostimulated luminescence autoradiography and Isotope Ratio Mass Spectrometry. The scale was identified as baryte (BaSO4 ) forming a dense crystalline matrix, with heterogenous texture and elongated crystals. The changing chemical and physical microenvironment within the pipe influenced the gradual growth rate of baryte over the production life of this infrastructure. A distinct compositional banding of baryte and celestine (SrSO4 ) bands was observed. Radioactivity attributed by the presence of radionuclides (226 Ra, 228 Ra) throughout the scale was strongly correlated with baryte. From the detailed scale characterization, we can infer the baryte scale gradually formed within the internals of the tubular well pipe along the duration of production (i.e., 17 years). This new knowledge and insight into the characteristics and formation of petroleum waste products will assist with decommissioning planning to mitigate potential radiological risks to marine ecosystems.
Full text links
Related Resources
Get seemless 1-tap access through your institution/university
For the best experience, use the Read mobile app
All material on this website is protected by copyright, Copyright © 1994-2024 by WebMD LLC.
This website also contains material copyrighted by 3rd parties.
By using this service, you agree to our terms of use and privacy policy.
Your Privacy Choices
You can now claim free CME credits for this literature searchClaim now
Get seemless 1-tap access through your institution/university
For the best experience, use the Read mobile app