Add like
Add dislike
Add to saved papers

High beam current operation of a PETtrace™ cyclotron for 18F- production.

Upgrades and optimisation achieved 160 μA total target current operation of a GE PETtrace cyclotron in dual target mode for the routine production of [(18)F]FDG for >2 years. Approximately 900 GBq of (18)F(-) and >500 GBq of [(18)F]FDG can be produced routinely in a single production run, meeting the routine [(18)F]FDG requirements with our customer base and achieving economies of scale. Production of >1 TBq of (18)F(-) in a single run was achieved. Reliability, saturation and synthesis yields were not adversely affected.

Full text links

We have located links that may give you full text access.
Can't access the paper?
Try logging in through your university/institutional subscription. For a smoother one-click institutional access experience, please use our mobile app.

Related Resources

For the best experience, use the Read mobile app

Mobile app image

Get seemless 1-tap access through your institution/university

For the best experience, use the Read mobile app

All material on this website is protected by copyright, Copyright © 1994-2024 by WebMD LLC.
This website also contains material copyrighted by 3rd parties.

By using this service, you agree to our terms of use and privacy policy.

Your Privacy Choices Toggle icon

You can now claim free CME credits for this literature searchClaim now

Get seemless 1-tap access through your institution/university

For the best experience, use the Read mobile app